PLANT COMMISIONING & MINING

Plant Commissioning Excellence

Responsible Resource Extraction

Mining is an essential industry, and our commitment to responsible resource extraction sets us apart. We prioritize environmentally conscious mining practices that minimize ecological impact while maximizing resource recovery. From open-pit to underground mining, our solutions adhere to the highest environmental standards.

Safety First

Safety is non-negotiable in the mining industry. Our comprehensive safety protocols ensure a secure working environment for your team. From state-of-the-art equipment to rigorous training programs, we prioritize safety measures that go beyond compliance to create a culture of well-being.

Plant Commissioning and Mining Excellence

The power generation facility will be set up with a 40% redundancy is built into the design to perform maintenance from time to time. A secure perimeter with intrusion detection and controlled access will be established.

The planning of construction is on a just-in time delivery principal in order to reduce the requirement for storage.

Preventative maintenance and corrective maintenance kit will be stored on-site for speedy action to any mechanical failures that may occur.

The power generated from the solar concentrator Power plant or any other sources needs to be integrated into the existing factory electrical supply, in order to provide a base load.

All the power generation units from the solar reflector technology power plant or any other sources will be terminated in a mini-substation.

We expect to put up different sizes of step-up transformers to adapt to the Client’s current power supply from the municipality/Escom.

The integration requirements will be finalized after on-site measurements and instrumentation of the current usage patterns. 6. Power 7. All aspects of the plant from security, environmental, technical and human related activates will be monitored locally as well as from The Rollout Company’s NOC (network operations center). A data link to the NOC will be part of the configuration

Seamless Startups

Embark on your industrial journey with confidence through our plant commissioning expertise. We specialize in seamless startups, ensuring that your facilities operate at peak performance from day one. Our meticulous approach, coupled with advanced commissioning methodologies, minimizes downtime and maximizes the efficiency of your plant.

Comprehensive Testing and Validation

Our commissioning process goes beyond the basics. We conduct comprehensive testing and validation to guarantee that every component of your plant operates according to design specifications. From equipment functionality to safety protocols, our thorough approach ensures that your plant is not just operational but optimized for long-term success.

WORK PROCESS

4 SIMPLE PROCESS TO FOLLOW

1

Pre-Commissioning Preparation

Conduct a thorough inspection and verification of all equipment, machinery, and systems to ensure readiness for commissioning.

2

Commissioning Procedures:

Follow standardized commissioning procedures and checklists to systematically test and verify the operation of each component and subsystem.

3

Performance Testing and Optimization

Perform performance testing and optimization to verify that the plant or mining operation meets design specifications and production targets.

4

Handover and Training

Prepare comprehensive documentation, including commissioning reports, operation manuals, and maintenance schedules, to facilitate the smooth handover of the plant or mining operation to the operations team.